98kWp PV system and connection to the Virtual Power Plant
Munich Electric-Renewable Energy Sources
General facts
98 kWp PV system and connection to the virtual power plant //
During this project several photovoltaic (PV) systems were installed on both new and existing/refurbished municipal schools in the project area by the City of Munich. These systems deliver a minimum of 118 kWp and get partly connected to a virtual power plant.
Further PV system with 60kWp is in preparation (Month 45)
City of Munich
Owner of PV systems implemented on schools (in cooperation with SWM)
Technical project coordination
SWM
Virtual power plant operator
Owner and Operator of the battery storage
https://www.swm.de/
MGS
Coordination of the topic within Smarter Together (Task Energy)
www.mgs-muenchen.de
Specific facts
- Kindergarden Aubinger Allee 152 ; 30kWp (2017)
- Primary School Gustl-Bayrhammer-Str. 21; 30 kWp (2017)
- Secondary School Reichenaustr. 3; 38 kWp (2017)
City of Munich
n.n
SWM
98kWp
n.n
n.n
122,70 €/MWh