A3 block Photovoltaic System (423 kWp)
Lyon Electric-Renewable Energy Sources
General facts
Installation of a Photovoltaic system on the roof of aa new building (A3 block).
SPL Lyon-Confluence (Policy maker)
ICADE (Real Estate Developer)
Transénergie (PV system developer)
- Delay in the installation
- Change of the PV system features
- No connection with the data platform
Specific facts
Connection of the Photovoltaic installation to the Lyon Métropole data platform.
March 2018
- Delay in the installation
- Change of the PV system features
- No connection with the data platform