Chanfray Gym Hall Photovoltaic System (206 kWp)
Lyon Electric-Renewable Energy Sources
General facts
Installation of a Photovoltaic system on the roof of a new building (A3 block).
SPL Lyon Confluence : urban developper of the Lyon-Confluence area
Icade : real estate developper
- Delay in the installation
- No final agreement between the building owner and the PV system developer
- PV system not installed
- No connection with the data platform
Specific facts
Connection of the Photovoltaic installation to the Lyon Métropole data platform.
March 2018
- Delay in the installation
- No final agreement between the building owner and the PV system developer
- PV system not installed
- No connection with the data platform