Local mobility strategy – 13 (VIE)

Vienna E-Mobility

General facts

Description & main goal

Local mobility strategy

Deployment area
Simmering
Involved actors and their role

VIE:

  • Urban Development Department
  • Different other departments (MA18) & municipal organisations
  • Local Renewal Office 
Key-contact person

Specific facts

Public / private sector (yes/no)

Public sector

Limited to project area (yes/no)

yes

Strategic framework and timeline

timeline corresponding to specification of locations for e-bike stations / mobility point (Sycube timeline)

Assessment factors (e.g. profitability, environmental measures)

“drafted” indicator set

Development process

Drafted by Urban Development Department
Topics discussed on the ground at SIMmobil with citizens
discussed with municipal stakeholders
Ongoing process and basis for detailed actions and ST solutions

Measure development and implementation planned (yes/no)

yes

Combination with other concepts (e.g. urban planning, action plans, business strategy) (yes/no)

Linkage to

  • Mobility Strategy
  • Urban Development Strategy
  • Smart City Vienna Framework Strategy
Implementation status

In which phase is the project (Planning, Implementation, Operation or Evaluation)?
Evaluation phase incl. operation
What is the current implementation status/ what is the current activity step?
The strategy is finished.
Is the implementation process on time or are there any derivations? Please outline any changes and reasons.
No.
Have there been changes regarding the planned solution? Please outline any changes and reasons.
No.
Which project steps were performed since the last project reporting?
The report was finished in autumn 2016.
 

Complete 100%
Which risks & challenges is the project currently facing?

None

Which are critical or seem invincible? Please provide a detailed description

None

Which previously identified risks and challenges have you managed successfully and how

The cooperation with the district during the work was not possible due to political reasons.
 

Which lessons learned can be derived up to this point from the implementation process?

Have external recommendations / lessons learnt from other projects (not in the WIKI) been used for the project development? 
- If yes, which ones and how?
Would this example be a good add to the Wiki?

No.
Have relevant internal recommendations / lessons from the WIKI’s best practices been used for the project development? 
If yes, which ones and how?

No.
Has the project development / implementation been supported by the SMARTER TOGETHER peer-to-peer knowledge exchange and cooperative problem solving?
If yes, how?

No.
Which lessons learned can be derived up to this point from the implementation process?
The integration of a mobility survey into a local mobility strategy is a big bonus.
A strength and weakness analyses for each type of mobility (car, bike, foot, public transport) is very helpful.
What could be done better in comparable future projects (what needs to be done and what needs to be prevented)
When a focus area is selected for urban renewal the mobility should always be taken into account.
The district should be integrated.
The findings should be integrated into the bigger concept (for example the main cycle path network).
Would you describe the project as best practice project and interesting for the WIKI? If yes, in what regard?
Yes
 

Next steps & To Do ́s

Please shortly outline the next steps planned for the implementation of the project.
None.
Are there additional steps planned due to occurred challenges? Which corrective activities have been taken?
None.
 

Implementation status

Status unchanged

Complete 100%
Implementation status

Status unchanged

Complete 100%